The execution order of the contacts and coils in a ladder circuit partly differs between MICREX-F and MICREX-SX. Therefore, if a MICREX-F program is convert... Show Detail
Does the SPH Series have SC instruction (step control instruction)?
The Standard Loader (V2.0.3.0 or later) supports SC instruction of the same specification as that of the MICREX-F Series. Show Detail
This is because the SX bus loop-back plug is not connected. Connect a loop-back plug to the base board. Show Detail
An order for one NP8B-BP means one plug will be delivered. If you need two plugs, order two pieces. The CPU module (Type_ NP1P***) and integrated type int... Show Detail
It is possible with the Ethernet module software version V36 or later by using the F_READ (read)/F_WRITE (write) FB. After writing, the power (or reset) o... Show Detail
With D300win V2, I cannot monitor some of the variables in the global variable worksheet.
They cannot be monitored if the number of rows in the variable worksheet exceeds 2520. Divide the variable worksheet so that the number of rows is 2500 or... Show Detail
Please tell me how to register a T-link model of UG (or V Series) as a POD in the system definition.
Select a T-link capsule and set the numbers of input/output words. By default, a POD requires one word for input and one word for output. Show Detail
The communication specification of the remote master does not control remote devices by the station No. Therefore, you cannot register remote devices as 'No ... Show Detail
You can use it as a standard base board by setting its station No. to '00.' In this case, you also need to set the system definition of the loader designed f... Show Detail
This was probably caused by one of the following two factors_ (1) ±OT is set to 'Disabled' in the parameter setting of the positioning control module (Type_... Show Detail
221-230 of Total 398