The P-link memory is prepared in the P-link module. It is separate from the memory in the CPU and no change takes place at the time of switchover to a standb... Show Detail
If the CPU modules are mounted on a hot plug base board with station No. setup function, you can replace them without turning off the power. Show Detail
Since the data equalization (data copying from the operating CPU to the standby CPU) is performed after the default task is processed, the larger the size of... Show Detail
When the power supply recovers to normal, the ALM contact automatically returns to the original position (open). Show Detail
The SX bus station number for the slot on which the CPU module is mounted is recognized as unused. Show Detail
You can mount or remove a CPU module during system operation, but not a power supply module. [Related document] For the details of hot plugging function, r... Show Detail
(1) With the SPH300/2000 Series, it is used to back up the data memory of the retained attributes, calendar IC memory, and RAS information. (2) With the SPH2... Show Detail
Is there an alarm output contact to use when an error occurs in the PLC system?
For an alarm contact output of an error of the PLC system, select an arbitrary output module in the system definitions and define its 0th bit as a 'system DO... Show Detail
When the memory with a retain attribute is corrupted, the CPU clears the memory and operates in nonfatal fault condition. If the power is reset again in this... Show Detail
Check the following system memory. (1) Configuration information %MW10.52 to %MW10.67 (WSM52 to 67) (2) Configuration fault information %MW10.68 to %MW1... Show Detail
21-30 of Total 34